<option id="6sg40"></option>
  • <li id="6sg40"></li>
    <label id="6sg40"><wbr id="6sg40"></wbr></label>
  • <legend id="6sg40"></legend>
    免费A毛片,日日摸日日碰夜夜爽无码,又色又黄18禁免费的网站在线,国产成人高清亚洲一区
    <option id="6sg40"></option>
  • <li id="6sg40"></li>
    <label id="6sg40"><wbr id="6sg40"></wbr></label>
  • <legend id="6sg40"></legend>
    China Coal Mengda (Inner Mongolia) MTO Project Start-up Successfully
    News
    News
     
    Shenda Chemicals (Shandong) MTO Project started up successfully
    www.bougetoila.com     Time:2015-01-05 14:50    column:News

    The sixth commercial DMTO plant, Shenda Chemicals (Shandong) MTO plant, started up successfully on Nov.29th,2014. Different from those five DMTO plants with 600 KTA olefin capacity on operation, this plant is the first DMTO plant with a 330 KTA olefin capacity. This project is well designed in its olefin downstream, including MTO unit (330 KTA), PP unit (200 KTA), Ethylene (170 KTA), EVA (100 KTA), EOD (120 KTA). Methanol feeding started on Nov.29th, polymer grade ethylene was produced on Dec.1st, and polymer grade propylene was produced on Dec.5th.

    Copyright 2009-2020. SYN Energy Technology Co., Ltd 遼ICP備08101217號
    ADD:NO.909C,Huangpu Road,High-Tech Zone,Dalian,China
    Tel:0411-86649777 Fax:0411-86649885